MDTA Home
  • Bay Bridge AET
  • Bay Bridge Success All Westbound Lanes Open
  • COVID-19 aet
  • Bay Bridge Success All Westbound Lanes Open
  • COVID-19 aet
  • All-Electronic Tolling is coming to the Bay Bridge!  Changes Coming By Summer 2020

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Friday, November 1, 2019

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Nov. 3 – 9

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Nov. 3 – 9

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Headlights are required at all times on the bridge.  Lane closures are subject to change and closure times are dependent on traffic volumes

 

TOLL DOLLARS AT WORK

Keywords

S M T W T F S
 
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30
 
31
 
 
 
 
 
 
 

Click to Translate:

Translation Disclaimer

Toll Rate Calculator

Toll Rate Calculator

Toll rates by vehicles, times, and facilities.

E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.