MDTA Home
  • Bay Bridge AET
  • Bay Bridge Success All Westbound Lanes Open
  • COVID-19 aet
  • Bay Bridge Success All Westbound Lanes Open
  • COVID-19 aet
  • All-Electronic Tolling is coming to the Bay Bridge!  Changes Coming By Summer 2020

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of March 1 – 7

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of March 1 – 7

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Headlights are required at all times on the bridgeLane closures are subject to change and closure times are dependent on traffic volumes

 

TOLL DOLLARS AT WORK

 

Reminder:  The right lane on the westbound span is closed 24/7 for roadwork.  Expect delays in both directions.

 

One lane of the eastbound span may be closed Sunday from 10 p.m. to 9 a.m. the following morning, Monday from 8 p.m. to 5 a.m. the following morning and Tuesday from 6 to 9 a.m. for base foundation concrete pours for new overhead tolling gantry between the bridge and MD 8 on eastbound US 50/301.  In the event of weather or other variables, one lane of the eastbound span may also be closed Wednesday and Thursday from 9 a.m. to noon.

 

One lane of the eastbound span may be closed Tuesday from 8 p.m. to 5 a.m. the following morning, Thursday from 9 p.m.to 5 a.m. the following morning and Friday from 10 p.m. to 7 a.m. the following morning for preservation/maintenance work or routine annual inspections. 

 

The westbound span may be closed Wednesday from 8 p.m. to 5 a.m. the following morning and Saturday from 9 p.m. to 8 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closure.

Note: Toll lanes 3, 4 & 5 closed for construction. E-ZPass only motorists use far-left lane approaching toll plaza (access lanes 1 & 2).  E-ZPass accepted in all open toll lanes.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com.

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Sign up for email/text alerts at mdta.maryland.gov.  Find us at facebook.com/TheMDTA.  Call 511 or visit MD511.org for statewide travel information.

Blog Category: 

Keywords

S M T W T F S
 
 
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 

Click to Translate:

Translation Disclaimer

Toll Rate Calculator

Toll Rate Calculator

Toll rates by vehicles, times, and facilities.

E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.