MDTA Home
  • CSC Hours
  • ezpassmd
  • Keep you Bridge Travels Safe - Plates Allow Crucial Deck Repairs
  • ALL AET
  • Bay Bridge AET
  • CSC Hours
  • ezpassmd
  • All-Electronic Tolling is coming to the Bay Bridge!  Changes Coming By Summer 2020
  • Keep you Bridge Travels Safe - Plates Allow Crucial Deck Repairs

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

MDTA Traffic Advisories

The MDTA Traffic Advisories blog posts information about scheduled construction and maintenance projects or other traffic information that might interfere with the normal flow of traffic. Use the Keywords list to locate traffic advisories by facility.

Bay Bridge Driver’s Alert

Coming Soon:

These two pieces of sizeable construction equipment (below) will be appearing at the Bay Bridge over the next week or so. They will be located in a work zone behind barrier on the western shore just prior to the bridge spans. No lanes of traffic on the bridge will be impacted beyond the routine weekday, off-peak lane closures (9 a.m. to 2:30 p.m. dependent on weather and traffic volumes). Crews will begin work installing foundations for new overhead lane signal gantries for the eastbound bridge approach. This is part of the ongoing project that will feature the reconfiguration of travel lanes to match the existing roadway that is expected to be completed in the fall of 2022. MDTA reminds motorists to avoid distractions, follow posted speed limits, obey all signs and traffic control devices. It's crucial to your safety and the safety of workers.

Blog Category: 
S M T W T F S
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
 
 
 
 
 
 

Click to Translate:

Translation Disclaimer

Toll Rate Calculator

Toll Rate Calculator

Toll rates by vehicles, times, and facilities.

E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.