MDTA Home
  • COVID-19 aet
  • I-895 Bridge Project - Follow link to learn more.
  • All-Electronic Tolling is coming to the Bay Bridge - Changes Coming by Summer 2020 - Follow link to learn more.
  • COVID-19 aet
  • Bay Bridge Roadwork... Follow link to learn more.
  • All-Electronic Tolling is coming to the Bay Bridge - Changes coming by 2020 - Follow link to learn more.

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge Traffic Advisories

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 15-21, 2015

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 15-21, 2015

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

 

FINAL STAGE OF CONCRETE REPAIR & TOLL BOOTH REPLACEMENT AT BAY BRIDGE TOLL PLAZA

FOR IMMEDIATE RELEASE

Feb. 10, 2015

 

Contact:         John Sales

                        410-537-1017

 

FINAL STAGE OF CONCRETE REPAIR & TOLL BOOTH REPLACEMENT AT BAY BRIDGE TOLL PLAZA

Toll Lanes 1-3 Will Close 24/7 For Work

 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 8 -- 14, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 8 - 14, 2015

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Feb. 1 -- 7, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 1 - 7, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 25 -- 31, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 25 - 31, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 18 -- 24, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 18 - 24, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 11 -- 17, 2015

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 11 - 17, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

CONCRETE REPAIR & TOLL BOOTH REPLACEMENT WORK CONTINUES AT BAY BRIDGE TOLL PLAZA

FOR IMMEDIATE RELEASE

Jan. 2, 2015

 

Contact:         John Sales

                        410-537-1017

 

CONCRETE REPAIR & TOLL BOOTH REPLACEMENT WORK CONTINUES AT BAY BRIDGE TOLL PLAZA

Toll Lanes #4-6 Will Close 24/7 For Work

 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 4, 2015-Jan. 10, 2015

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of Jan. 4, 2015-Jan. 10, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

 

Pages

Keywords

S M T W T F S
 
 
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 

Click to Translate:

Translation Disclaimer

Toll Rate Calculator

Toll Rate Calculator

Toll rates by vehicles, times, and facilities.

E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.