Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Jan. 4  10, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

The eastbound span may be closed Monday through Thursday from 8 p.m. to 5 a.m. the following morning, Friday from 9 p.m. to 8 a.m. the following morning and Saturday from 8 p.m. to 9 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the eastbound span may be closed Monday through Friday from 9 a.m. to  2:30 p.m. for preservation/maintenance work.  Two-way traffic will operate on the westbound span.

Monday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up. 

Note:  Concrete repair and replacement project underway at Bay Bridge toll plaza.  Lanes 6-8 and associated toll booths will reopen by 5 a.m. Monday morning and lanes 4-6 will close continuously (24/7) for approximately eight weeks.  Pay attention to overhead and portable electronic signs.