Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of August 25 - 31, 2013

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

 

TOLL DOLLARS AT WORK

 

The westbound span may be closed Monday through Wednesday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work.  Two-way traffic will operate on the eastbound span during the full westbound span closures.

One lane of the westbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. for preservation/maintenance work. 

Monday through Wednesday at 3:30 p.m., the right lane of the westbound span will be closed for approximately 15 minutes for contractor pick-up.  Weather-permitting, two-way operations will not be implemented until after the westbound right lane opens to traffic.

The MDTA offers the following travel tips for the summer months:

·        Travel off-peak when heading to and from the Eastern Shore.  The best times to travel the Bay Bridge on weekends include:

  •          Friday before 10 a.m. and after 10 p.m.
  •          Saturday before 7 a.m. and after 5 p.m.
  •          Sunday before 10 a.m. and after 10 p.m.

  

 

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION

CALL 1-877-BAYSPAN (1-877-229-7726) or visit baybridge.com

 

 

Know Before You Go - call 511 or visit MD511.org.  Follow the MDTA at twitter.com/TheMDTA, facebook.com/TheMDTA and mdta.maryland.gov. 

    

###