Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Feb. 1 - 7, 2015

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

TOLL DOLLARS AT WORK

 

REMINDER: Headlights are required at all times on the bridge.

 

The eastbound span may be closed Sunday through Thursday from 8 p.m. to 5 a.m. the following morning, Friday from 9 p.m. to 8 a.m. the following morning and Saturday from 8 p.m. to 9 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the eastbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to noon for preservation/maintenance work.  Two-way traffic will operate on the westbound span.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 3, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span.  Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lane 9.

Monday through Friday, one lane will be closed for approximately 15 minutes for contractor pick-up. 

Note:  Concrete repair and replacement project underway at Bay Bridge toll plaza.  Lanes 4-6 and associated toll booths remain continuously (24/7) closed.  Pay attention to overhead and portable electronic signs. 

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA.  Find us at facebook.com/TheMDTA and mdta.maryland.gov.  Call 511 or visit MD511.org for statewide travel information.                                                   

###